Project: Rehabilitation of Apron C & Taxilanes H & 11
Projected Start Date: Monday, April 22, 2024

This project includes the rehabilitation of the Apron C (approximately 82,600 SF of apron pavement) and Taxilanes H and 11 (approximately 1,150 LF of taxilanes). The rehabilitation includes asphalt pavement rehabilitation to address the deteriorating pavement condition and non-standard grading. Also included with the project is associated crack repair, storm water measures, turf grading, seeding, mulching, tie-down removal/replacement and pavement markings.

The project will modify the apron grades for improved aircraft rideability and will also decrease the risk of foreign object debris (FOD) generation that may result from pavement degradation. The project will also include installation of new aircraft tie-downs and an updated pavement marking scheme based on the airports current and anticipated operational needs.